JYSK, Tomislavgrad

Air conditioning and ventilation of the new 1,200 m² store, opened on 6 May 2026.

  • A row of outdoor units on the shop's dark facade
  • Cassette indoor units under the ceiling of the sales hall
  • The hall ceiling with cassette units, skylights and ventilation ducts
  • Ventilation unit with insulated ducts under the roof
  • Ventilation unit and ducts above the sales floor
  • Cassette unit and ventilation unit under the ceiling
  • Insulated ventilation ducts during installation
  • Outdoor units on the facade during the works
  • Four Fujitsu wired controllers on the wall
  • Four controllers of the ventilation units